Members planning around laptops and drawings on a club night

Our next club layout

Building Eastleigh

Eastleigh as it is today, in N gauge, and built to the same standard as Redbridge Wharf. This page follows the build, using the updates in Chairman's Chatter.

Planning session on a club night

Progress

Where we're up to

11 of 12 baseboards assembled

  • Done

    Concept track plan

    A plan that shows we can fit something worthwhile into a reasonable space.

  • Done

    Baseboard kits

    Grainge & Hodder kits for all twelve boards arrived in the spring.

  • Under way

    Baseboards

    Eleven of the twelve are assembled and braced, and most are painted. The last one needs its bracing adjusted in three places to clear the point mechanisms.

  • Under way

    Transport trolleys

    The prototype is built and was shortened to fit between van wheel arches. The second is nearly finished and the third is well under way.

  • Under way

    Lighting

    Cheap 12 volt LED units are chosen, to be carried on Redbridge's old aluminium poles cut down to size. The mounts still need designing.

  • Under way

    Plain track

    Roger S has made more than 20 metres by threading rail into plastic sleeper bases.

  • Still to do

    Backscene supports

    We're working out how the front and rear board pairs join to carry the lighting uprights and the backscene.

  • Still to do

    Points

    All still to build, along with the rest of the track through the station and the works.

  • Still to do

    Wiring and control

    How the layout will be controlled is still to be decided. The plan is to add wires and devices as the track goes down.

  • Still to do

    Buildings and scenery

    Including the works, which the track plan is being shaped around.

Build log

From the Chairman's Chatter

Every quarter Dave R reports on the build. Each stop links to the full update.

January 2026

Talks begin. A concept track plan shows we can build something worthwhile in a reasonable space, and the club asks for a project lead or two.

Read the January 2026 update

April 2026

"At last, concrete progress!" Baseboard kits for all twelve boards arrive and assembly starts. Roger S makes more than 20 metres of plain track.

Read the April 2026 update

July 2026

Eight boards are assembled and four have been primed. Eleven members meet to talk through transport, staging, lighting, backscenes, track and operation.

Read the July 2026 update

October 2026

Eleven boards are assembled, braced and mostly painted. The first trolley is built, with its wheels set in so the layout sits at almost the same height as Redbridge, and the lighting is chosen.

Read the October 2026 update
Members planning around laptops and drawings on a club night

Lend a hand

What needs doing next

There are jobs for every level of experience. Coming up next:

  • finishing the last baseboard and the backscene supports
  • designing the mounts for the lighting
  • building points and laying track
  • deciding how the layout will be controlled, then wiring it
  • making the buildings, starting with the works

In the chairman’s words: if you fancy taking the lead on any part of it, that can easily be arranged.